

Modular prestressed bridge-beam formwork: the mould is designed for the rebar-tensioning technology. Different span lengths are made up from modules, and the section is held precisely.
Span make-up by mould sections.
Compatible with the tensioning bed.
Precise seating for anchors/ducts.

The mould is assembled to the required length, the tensioned reinforcement and cage are installed, and after tensioning and concreting the beam is stripped. We'll pick modules for the span.
Request a quotePrestressed beam formwork — we'll match it to the span.
Get a quote in 1 day