

Steel formwork for a 33 m span precast bridge beam: a full-profile mould with side panels and ends. Precise section and embedded-part geometry for series beam production at the yard.
Form the wall and flange profile.
Precise dimensions and rebar starter bars.
Clean stripping of a long beam.

A reinforcement cage is placed in the mould, the beam is concreted, and after strength gain the side panels open and the beam is removed. We'll make the mould to your design section.
Request a quote33 m beam formwork — we'll make the mould to the section.
Get a quote in 1 day